Notice of Utility Work Throughout July

Hydro One has completed the majority of the tree trimming and digging holes for the new poles. Crews are expected to be in the area throughout July to install new hydro infrastructure (poles, transformers, anchors, support cables, etc.). Residents will be notified of planned power outages during these works.

To protect everyone’s health and safety, it is imperative that residents DO NOT interfere with Hydro One during utility work. There will be heavy machinery working around high voltage power lines.

Questions or concerns about the utility work can be directed to:

Caitlyn Frost
Senior Program Manager
Hydro One Networks Inc.
Phone: 613-898-3291
Email: Caitlyn.Frost@hydroone.com


OR

Colin Parks
Project Manager
Township of King
Phone: 905-833-6568
Email: cparks@king.ca


Vibration Monitoring

Please note that NO ROAD CONSTRUCTION will start until the vibration engineer has completed their pre-condition assessment. There will be educational material sent in advance about the pre-condition assessment process, how vibrations will be monitored, the various vibration thresholds, and the claim process for any damages. Residents can expect preliminary information to be sent in the coming weeks.