Rollover Curbs will be Installed in Kettleby
In response to feedback from the community, the road design has been revised with minor change to the storm sewer, such that rollover curbs will be installed throughout the entire project on both sides of the road. While this is not the Township standard, consideration can be provided, given the historic character, narrow right-of-way and to accommodate the demand for street parking. The asphalt snow storage strip must remain to facilitate snow-clearing operations.
Other comments received:
Reinstate original road alignment
The change in road alignment is negligible. Minor shifting of the centerline was required to limit impacts to private property.
Ensure vibration tolerances are set at levels for stone and mortar foundations and dug well structures
As posted previously, the vibration criteria will follow the widely-adopted City of Toronto standard which includes lower tolerance for heritage properties.
Also reminder to residents to book a pre-condition survey with dBA Services.
Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends