Kettleby Road Reconstruction

Share Kettleby Road Reconstruction on Facebook Share Kettleby Road Reconstruction on Twitter Share Kettleby Road Reconstruction on Linkedin Email Kettleby Road Reconstruction link

Kettleby is a small hamlet located on Kettleby Road between Jane Street and Keele Street in the Township of King. The downtown core along Kettleby Road is in need of rehabilitation to replace deteriorating infrastructure within the Township right-of-way. As part of the Township of King’s capital works road improvement program, the Township is planning to reconstruct this 720 m segment of Kettleby Road between Kettleby Bridge on the west and the eastern limit of the community, with an approved budget of $2.7 million over three years (2023-2025).

Kettleby is a small hamlet located on Kettleby Road between Jane Street and Keele Street in the Township of King. The downtown core along Kettleby Road is in need of rehabilitation to replace deteriorating infrastructure within the Township right-of-way. As part of the Township of King’s capital works road improvement program, the Township is planning to reconstruct this 720 m segment of Kettleby Road between Kettleby Bridge on the west and the eastern limit of the community, with an approved budget of $2.7 million over three years (2023-2025).

  • Kettleby Road Reconstruction Public Information Centre

    Share Kettleby Road Reconstruction Public Information Centre on Facebook Share Kettleby Road Reconstruction Public Information Centre on Twitter Share Kettleby Road Reconstruction Public Information Centre on Linkedin Email Kettleby Road Reconstruction Public Information Centre link
    supporting image

    On December 6th, 2022 between 6:30 pm and 8:30 pm, the Township hosted an in-person Public Engagement Session at the Kettleby Anglican Church (292 Kettleby Rd, Kettleby, ON L0G 1J0).

    The Public Engagement Session described the project and provided residents with an opportunity to review current design alternatives under consideration, proposed schedules, and to provide feedback to be considered as the design progresses.

    Check back for further engagement opportunities.

Page last updated: 12 Jun 2025, 01:29 PM